2015.08.12 Removal Action Workplan, Corporatin Yard Soil Removal Action Final Construction Drawings and Specifications Transmittal Letter |
UC Berkeley |
2015 |
Transmittal Letter |
2015.08.07 Draft Phase IV Sampling Results Technical Memorandum DTSC Comment Letter |
DTSC |
2015 |
Agency Letter |
2015.07.24 Draft 2015 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2015 |
Report |
2015.07.24 Draft 2015 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2015 |
Transmittal Letter |
2015.07.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2015 |
Report |
2015.07.10 RFS Corporation Yard Removal Action Plans |
Tetra Tech |
2015 |
Report |
2015.07.09 2014 Groundwater Sampling Results, Vicinity of the Biologically Active Permeable Barrier, Approval Letter |
DTSC |
2015 |
Agency Letter |
2015.06.26 RFS Corporation Yard Removal Action Specifications |
Tetra Tech |
2015 |
Report |
2015.06.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2015 |
Report |
2015.06.05 Draft Phase IV Sampling Results Technical Memorandum |
Tetra Tech |
2015 |
Report |
2015.06.05 Draft Phase IV Sampling Results Technical Memorandum, Transmittal Letter |
Tetra Tech |
2015 |
Transmittal Letter |
2015.06.01 Sampling Results for Waste Characterization Sampling from the Phase IV Biologically Active Permeable Area (BAPB) Piezometer Installation |
UC Berkeley |
2015 |
Report |
2015.05.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2015 |
Report |
2015.04.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2015 |
Report |
2015.03.17 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2015 |
Report |
2015.02.20 Sampling Results for Western Stege Marsh Near-Surface Sediment Samples, January 27, 2015 Sampling Event, Richmond Field Station Site |
Tetra Tech |
2015 |
Report |
2015.02.17 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2015 |
Report |
2015.02.02 Annual Groundwater and Surface Water Monitoring Report, January 1 through December 31, 2014, Campus Bay |
Terraphase |
2015 |
Report |
2015.01.26 BCDC Permit Revision Number 3 |
BCDC |
2015 |
Orders & Permits |
2015.01.26 BCDC Permit Revision Number 3 Cover Letter |
BCDC |
2015 |
Transmittal Letter |
2015.01.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2015 |
Report |
2015.01.15 Response to Comments for "Monitoring Well Installation Report and Initial Groundwater Sampling Results, Vicinity of the Biologically Active Permeable Barrier" DTSC Approval Letter |
DTSC |
2015 |
Agency Letter |
2014.12.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2014 |
Report |
2014.12.08. LBNL DAS Soil Sampling Report |
Tetra Tech |
2014 |
Report |
2014.12.08 GSU Report of Completion of a Magnetometer Survey at the UC Richmond Field Station |
Geological Services Unit |
2014 |
Report |
2014.12.01 LBNL SEISMIC Form B |
UC Berkeley |
2014 |
Report |
2014.11.24 Final 2014 Groundwater Sampling Results Technical Memorandum |
Tetra Tech |
2014 |
Report |
2018.11.18 Draft 2014 Groundwater Sampling Results Technical Memorandum, Approval Letter |
DTSC |
2014 |
Agency Letter |
2014.11.17 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2014 |
Report |
2014.11.13 Final Pre-Design Investigation Report for Habitat Area 2, Campus Bay Site |
Arcadis |
2014 |
Report |
2014.11.13 LBNL SEISMIC DTSC approval |
DTSC |
2014 |
Agency Letter |
2014.10.24 LBNL SEISMIC Revised Sampling Plan to DTSC |
Tetra Tech |
2014 |
Report |
2014.11.03 Final Phase IV Field Sampling Plan Addendum I, Approval Letter |
DTSC |
2014 |
Agency Letter |
2014.11.03 PEERfootings Form A and July 18, 2014 Soil Sampling Letter to DTSC |
UC Berkeley; Tetra Tech |
2014 |
Report |
2014.10.31 PEER pipevalve October 31, 2014 Completion Letter to DTSC |
UC Berkeley |
2014 |
Report |
2014.10.29 Bulb Exploratory Excavation Upwind Personal Data Real-time Aerosol Monitor |
UC Berkeley |
2014 |
Air Monitoring Data |
2014.10.29 Bulb Exploratory Excavation Downwind Personal Data Real-time Aerosol Monitor |
UC Berkeley |
2014 |
Air Monitoring Data |
2014.10.28 Final Phase IV Field Sampling Plan Addendum 1 |
Tetra Tech |
2014 |
Report |
2014.10.24 LBNL SEISMIC Form A |
UC Berkeley |
2014 |
Report |
2014.10.22 Exploratory Excavation Work Plan, Exploratory Investigation for Magnetic Anomaly Source in Bulb, Comment Letter |
DTSC |
2014 |
Agency Letter |
2014.10.20 Building 280A and Building 450 Soil Sampling Plan, Comment Letter |
DTSC |
2014 |
Agency Letter |
2014.10.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2014 |
Report |
2014.10.10 Building 280A and Building 450 Soil Sampling |
UC Berkeley |
2014 |
Report |
2014.10.08 PEERpipevalve Form A |
UC Berkeley; Tetra Tech |
2014 |
Report |
2014.10.06 Final Phase IV Field Sampling Plan |
Tetra Tech |
2014 |
Report |
2014.09.25 Draft Phase IV Field Sampling Plan, Comment Letter |
DTSC |
2014 |
Agency Letter |
2014.09.19 Response to Department of Toxic Substances Control Comments Regarding the “Monitoring Well Installation Report and Initial Groundwater Sampling Results, Vicinity of the Biologically Active Permeable Barrier, University of California, Richmond F |
Terraphase |
2014 |
Report |
2014.09.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2014 |
Report |
2014.08.15 Richmond Field Station Monthly Summary Report |
UC Berkeley |
2014 |
Report |
2014.07.18 Final Removal Action Workplan, Richmond Bay Campus, Research, Education, and Support Area within the Former Richmond Field Station Site |
Tetra Tech |
2014 |
Report |