2002.12.09 Conservation Easement, East Bay Regional Park District |
Kier & Wright |
2002 |
Figure |
2002.11.06 Final Remedial Design Details - Addendum 2 Mercury Treatability Study Results |
URS |
2002 |
Report |
2002.11.01 Response to Comments on Human Health and Ecological Risk Assessment, letter to RWQCB |
URS |
2002 |
Report |
2002.08.16 Final Remedial Design Details - Addendum |
URS |
2002 |
Report |
2002.06.05 Letter to USFWS, Section 7 Consultation Supplemental Information |
URS |
2002 |
Report |
2002.03.19 RWQCB Water Quality Certification for Cleanup Activities Required by SCRs 01-101 and 01-102 |
RWQCB |
2002 |
Orders & Permits |
2002.02.28 Workplan for Additional Soil and Groundwater Investigation |
URS |
2002 |
Report |
2002.02.28 Final Workplan for Additional Sediment and Surface Water Sampling, Marsh Portion of Subunit 2B |
URS |
2002 |
Report |
2001.11.21 Final Results of Additional Soil and Groundwater Investigations and Surface Water Monitoring Plan, Marsh Portions of Subunit 2A |
URS |
2001 |
Report |
2001.11.21 Final Results of Additional Soil and Groundwater Investigations and Groundwater Monitoring Plan, Upland Portion of Subunit 2A, Volume 2 of 2 |
URS |
2001 |
Report |
2001.11.21 Final Results of Additional Soil and Groundwater Investigations and Groundwater Monitoring Plan, Upland Portion of Subunit 2A, Volume 1 of 2 |
URS |
2001 |
Report |
2001.11.13 Evaluation of the Zeneca Richmond Facility as Salt Marsh Harvest Mouse Habitat |
H.T. Harvey & Associates |
2001 |
Report |
2001.11 Human Health and Ecological Tiered Risk Evaluation, University of California, Berkeley, Richmond Field Station/Stege Marsh |
URS |
2001 |
Report |
2001.10 California Regional Water Quality Control Board San Francisco Bay Region Order No. 01-102 Site Cleanup Requirements for: University of California Berkeley Zeneca Inc. Meade Street Operable Unit Subunit 2 |
RWQCB |
2001 |
Orders & Permits |
2000.12 Final Field Sampling and Analyses Results |
URS |
2000 |
Report |
1999.12.10 Final Field Sampling and Analysis Plan and Tiered Risk Evaluation |
URS |
1999 |
Report |
1994.11 Richmond Field Station Lepidoptera Survey, Revised |
Jerry A. Powell |
1994 |
Report |
1994.01.28 Richmond Research Center Master Plan, Environmental Impact Report |
Brady and Associates |
1994 |
Report |
1993.11.16 Richmond Research Center Master Plan, Environmental Impact Report: Existing Conditions of Grassland Resources |
David Amme Associates |
1993 |
Report |
1992.08.24 Richmond Field Station Lepidoptera Survey, Revised |
Jerry A. Powell |
1992 |
Report |
1991.03.22 EPA Region 9 Laboratory Siting |
EPA |
1991 |
Agency Letter |
1991.02.22 Final Risk Assessment Report |
Jonas & Associates Inc |
1991 |
Report |
1990.05.21 Removal Site Evaluation of Mercury in Soil and Groundwater at Former Mercury Fulminate Area |
Jonas & Associates Inc |
1990 |
Report |
1990.05.21 Draft Environmental Soil Sampling and Analysis Plan for Construction of EPA Laboratory |
Jonas & Associates Inc |
1990 |
Report |
1990.04.06 Environmental Assessment for the Proposed EPA Region 9 Laboratory at the University of California's Richmond Field Station |
Jones & Stokes Associates, Inc |
1990 |
Report |
1990.03.27 Update Letter to Department of Health Services |
UC Berkeley |
1990 |
Transmittal Letter |
1990.03.22 Preliminary Investigation of Mercury in Soil and Groundwater at Former Mercury Fulminate Facility |
Jonas & Associates Inc |
1990 |
Report |
1989.05 The Natural Areas of the University of California Richmond Field Station |
Joyce Gutstein |
1989 |
Report |
1989.08 Environmental Assessment of University of California Richmond Field Station |
Ensco Environmental Services |
1989 |
Report |
1941.06.30 East Bay Cityies Sewage Disposal Survey Report Upon the Collection, Treatement, and Disposal of Sewage and Industrial Wastes of the East Bay Cities, California |
The Board of Consuliting Engineers |
1941 |
Report |